Einträge von

Hot-dip Galvanized Steel Pipe Welding Construction Process

Before hot-dip galvanized steel pipe welding, the hot-dip galvanized steel pipe is mainly heated, and welding begins after temperature control for 30 minutes. The heating, solid layer temperature and heat treatment process of welding are automatically controlled by the temperature control cabinet of the heat treatment process. The far-infrared crawler heat treatment furnace is used […]

Ten Key Points Of Heat Treatment Of Galvanized Pipes

1. Galvanized pipes and fixtures should be cleaned of foreign objects such as oil, residual salt, paint, etc. before heat treatment; 2. The fixtures used in the vacuum furnace for the first time should be degassed and purified in advance at a vacuum degree not lower than the required degree of the workpiece; 3. Workpieces […]

Application of plastic-coated steel pipes

Plastic-coated steel pipes are used everywhere in life, such as building water supply pipes, fire water supply pipes, special pipes for coal mines, hot spring anti-corrosion and thermal insulation pipes, and cable protection pipes commonly seen in modern life. Common steel-plastic composite pipes are actually mainly plastic-lined steel pipes and plastic-coated steel pipes. The following […]

Safety Precautions For Anti-corrosion Steel Pipe Construction

3PE anti-corrosion steel pipe spraying technology, most domestic 3PE anti-corrosion steel pipe production technology adopts the production and processing technology of “epoxy powder spraying, adhesive and polyethylene lateral extrusion, winding rolling”, because the powder and electrostatic thermal spraying method does not require rolling system, thus solving the problem of thin weld coating of spiral structure […]

Storage Standards For Anti-corrosion Steel Pipes

I believe many people have doubts about the storage of anti-corrosion steel pipes. Let’s take a look at the storage of anti-corrosion steel pipes. 1. The appearance of anti-corrosion steel pipes entering and leaving the warehouse needs to be inspected as follows: ① Inspect each root to ensure that the surface of the polyethylene layer […]